Seam Phantom Process
The pictures below show how a "Seam Phantom®" seam is produced. The entire process shown below takes about 7 to 10 minutes per side or 15 to 20 minutes per full seam.
|
Gallery: Seam Phantom Process
Set up the Rail |
Note how the Gauge Block is set. Can be to the Edge, or to a Tape Line. |
Clamp it down |
Set Up Seam Phantom with 2" cup wheel for Back Grinding |
Backgrinding |
Stop short of Front Edge of Counter with Backgrind |
Use Adjustment Knob to take off more material |
Front Edge - After Backgrinding |
After Backgrinding |
60 Grit Turbo |
Dressing |
150 Grit Turbo (then up to 300 if desired) |
Work Left to Right |
Pause to Check |
Check to ensure it's straight |
Front Edge - After Dressing |
Back Edge after Dressing |
Sweetness! No chips. Perfectly Straight Edge. Required element for a Perfect Seam. |
|